
Project Summary
This is a proposed roadway project the entails the addition of on-street parking, drainage replacement, streetscape improvements and raised pedestrian crosswalks at the Manatee Center and Riverwalk Center.
Project Benefits
Revitalization of this corridor (0.38 miles) which provides a connection from the beach areas to downtown Fort Pierce, is another step in revitalizing the City. Due to the number of events that take place in the downtown area, additional on-street parking and enhanced pedestrian crossings are needed.
Project Costs
Engineering: $80,850 – Unfunded
Construction: $1,989,150 – Unfunded